Tomorrow: No. Rain until 16:00, and the rock stays wet after it.
How to read the dial
- Dry
- Fast‑drying sectors only
- Wet
- Now
- When it dries
Tomorrow: No. Rain until 16:00, and the rock stays wet after it.
Only these emails, and every one has a stop link. Privacy
Bouldering gyms near the forest, for a wet day.
Best time to climb at Meschia Nuova, month by month
Meschia Nuova: sandstone boulders in the forest, in Marche, Italy. The nearest other areas here are Tintorale (35 km), Soriano nel Cimino (109 km) and Sassofortino (187 km).
The answer at the top of this page comes from the German weather service's forecast and how fast sandstone dries, and it's updated through the day. Nobody checks the rock in person, so touch the holds before you climb.
Meschia Nuova is sandstone, which soaks up rain and stays weak inside for a while after the surface looks dry. These times are the model's estimates, tuned on Fontainebleau sandstone and not checked here. After a proper soaking (2 mm of rain or more), sunny, windy boulders need about 18 hours of dry weather, most of the forest about 30 hours, and shaded ones about 42 hours. A light shower needs less. Wind, sun and dry air shorten the wait, and above about 92% humidity the model won't call the rock dry.
Wet sandstone breaks. If a hold feels cool or damp, leave it for another day.